Below is a list of construction events that are not yet active, but are scheduled to begin sometime within the next 96 hours (today at 4 PM and Saturday at 4 PM). Only routes/counties with construction scheduled in the 96 hour time window are listed.
- Metro Atlanta (129)
-
Interstates/Freeways (80)
-
Local Roads (Non-Freeway) (49)
- Other Areas (107)
-
Interstates/Freeways (32)
-
Local Roads (Non-Freeway) (75)